Chapters

One extension, from drawings to keys

Follow a single imaginary rear extension in England through every decision a homeowner makes: which route to take, how to read three builder quotes, what to sign and when to pay.

Start with the first decisionCompare my quotes

The decision that shapes the rest

The first choice is about who you hire, not bricks or glass. Either an architect designs and builders compete to price the drawings, or one company designs and builds for a single price. The first gives you an independent designer and a price tested by the market. The second gives you one point of responsibility and a quicker start.

Most extensions in England sit somewhere between the two. Chapter 1 sets out the trade-offs, the fees on each route and five questions that settle it. If you would rather answer the questions straight away, the route chooser takes about two minutes.

Extension drawings spread across an oak kitchen table with a pencil, scale rule and mug in evening light

How much of the price is still a guess?

Enter a builder's total and the provisional and PC sums inside it. Under 10% is a firm price. Over 15% means a large part will be settled later, usually upwards.

Why allowances matter ยท Compare three full quotes

16.4% provisional, high.

Three tools for the kitchen table

They run in your browser and send nothing anywhere.

What happens, in order

A typical single-storey rear extension in England takes six to eighteen months from first sketch to handover. Roughly:

  1. Brief, survey and route. Decide who designs and who builds.
  2. Design and planning. Planning permission, prior approval or permitted development; party wall notices if you build on or near the boundary.
  3. Technical drawings. Building regulations drawings, structural calculations, specification.
  4. Quotes or tender. Three builders, one package, like-for-like comparison.
  5. Contract and payments. A written contract, stage payments tied to work and retention held until defects are fixed.
  6. Build and handover. Inspections, completion certificate, final account, then the retention release.

Before anyone starts, have the questions to ask a builder printed and ready.

Honest notes

Designer Builder is an independent guide. It does not build, design, refer or sell anything. The house in the films is imaginary and the films were made for this site from generated stills. Figures are typical ranges for England in 2026 with their basis stated, and the legal points were checked against official sources in November 2026. More about the site.